Skip to main content

Sharecafe

NexGen Energy Reports Significant High-Grade Uranium Expansion at Patterson Corridor East

Thumbnail
Ongoing 2026 drilling campaign boosts vertical and strike extent of mineralisation at PCE discovery.

NexGen Energy Ltd. (ASX: NXG) has announced significant progress from its ongoing 2026 drilling campaign at the Patterson Corridor East (PCE) discovery, located 3.5 km from its Arrow Deposit. NexGen Energy is a Canadian company focused on delivering clean energy fuel for the future. Its flagship Rook I Project is being developed into a significant low-cost producing uranium mine globally. The latest results, stemming from fifteen additional drill holes, highlight a substantial expansion of the high-grade subdomain and strong confirmation of internal continuity for intense high-grade uranium mineralisation at PCE.

The company reported a further increase of 95 metres in the vertical extent of the high-grade subdomain to 739 metres, representing a 15% growth, notably achieved by hole RK-26-293c1 with cumulative 2.5 metres of >10,000 cps. Concurrently, the strike length of the high-grade subdomain expanded by 28 metres to 238 metres, a 13% increase, with new intersections identified to both the southwest and northeast. These developments build upon the 2026 drilling campaign’s overall success, which has already grown the total mineralised footprint vertically by 205 metres to 905 metres (a 29% increase) and along strike by 58 metres to 678 metres (a 9% increase).

Strong continuity of intense high-grade mineralisation was further confirmed by hole RK-26-300, which intersected a cumulative 10.0 metres of >10,000 cps, including 1.8 metres of >61,000 cps. This intersection helps to widen an area of intense high-grade material within the subdomain. The southwest portion of the high-grade subdomain is emerging as a key growth area, showing expanded continuity through results like RK-26-299c1. To date, 47 drillholes totalling 31,480 metres have been completed at PCE in 2026, with the remaining 42,000-metre program set to focus on internal high-grade continuity and continued expansion.

Serving up fresh finance news, marker movers & expertise.
LinkedIn
Email
X

All Categories

Subscribe

get the latest