Sharecafe

Argent Minerals Completes Diamond Drilling at Kempfield Project

Thumbnail
Drilling concludes at Lodes 100 and 200, samples sent for priority assay

Argent Minerals Limited (ARD), an Australian-focused silver and precious metals developer, has announced the completion of diamond drilling over Lodes 100 and 200 within its 100%-owned Kempfield Polymetallic Project in New South Wales. A total of 422.7 metres were drilled, with hole AKDD208 reaching a depth of 339.3 metres targeting Lode 200, and hole AKDD209 drilled to 85 metres within Lode 100.

All drill samples have been dispatched to ALS Laboratories in Orange for priority assay. The company anticipates receiving the results by late September 2025. Once the assay results are received, the metallurgical core will be sent to Auralia Metallurgy for Heap Leach and CIL/Flotation test work.

Drilling of AKDD209 was terminated at 85 metres due to localised ground conditions. Following a risk assessment, Argent Minerals decided to cease drilling at that depth. The company is currently expanding the drilling over Lode 200 based on field observations, with final decisions pending the assay results.

The announcement has been authorised for release by the Board of Argent Minerals Limited. Argent Minerals Limited is an ASX listed public company focused on the development of its flagship 100%-owned Kempfield Project in New South Wales which hosts Australia’s second largest undeveloped silver deposit.

Serving up fresh finance news, marker movers & expertise.
LinkedIn
Email
X

All Categories

Subscribe

get the latest